Lorem ipsum dolor sit amet, consectetur adipiscing elit. Cras sollicitudin, tellus vitae condimentum egestas, libero dolor auctor tellus, eu consectetur neque.

Press enter to begin your search

Taxiway D Rehabilitation and Extension

Amherst/Hanson Consulting / Taxiway D Rehabilitation and Extension

Taxiway D Rehabilitation and Extension

This work consisted of the design and construction of the extension of Taxiway D. 1700 linear feet, including airfield markings, lighting, signage, closed drainage, earthwork and demolition. It also involved realignment of a 24’ foot wide perimeter road and associated drainage.
Perform new pavement design based on the latest approved ALP, latest FAA Advisory Circulars, proposed fleet mix, and other considerations. Prepare a detailed construction safety and phasing plan to increase safety and minimize disruptions to current operations. Coordinate with FAA throughout the project, from pre-design through project closeout. Perform construction inspection services with continuous monitoring of the project schedule and cost.

Category

Taxiway Rehabilitate and Reconstruction Projects