The Taxiway E1 Improvements and Airside Center Apron Rehabilitation project consists of a relocation of the existing Taxiway E1 and resurfacing the Airside Center apron along with associated drainage improvements and utility relocations to improve the functionality of this key access point. Phasing was structured so that ARFF vehicles and tenants, including those using aircraft up to a Boeing 737-900, were provided continuous access to Airside Center facilities throughout construction.