Lorem ipsum dolor sit amet, consectetur adipiscing elit. Cras sollicitudin, tellus vitae condimentum egestas, libero dolor auctor tellus, eu consectetur neque.

Press enter to begin your search
 

Taxiway B Extension

Amherst/Hanson Consulting / Taxiway B Extension

Taxiway B Extension

This substantial improvement to airport infrastructure included extending the 50 foot wide Taxiway B, 2,900 linear feet. In addition this project included airport markings, new airfield lighting and signage, and a closed drainage along with associated earthwork, demolition and grassing. Associated improvements included the realignment of approximately 1,626 lf of 24 foot wide Doolittle Road. Perform new pavement design based on the latest approved ALP, FAA Advisory Circulars, proposed fleet mix, and other considerations. Prepare a detailed construction safety and phasing plan to increase safety and minimize disruptions to current operations. Coordinate with FAA pre-design through project closeout. Perform construction inspection services with continuous monitoring of the project schedule and cost.

Category

Taxiway Rehabilitate and Reconstruction Projects